Blansko, Czechia, block of flats

The realization of boiler room after disconnection from the central heat source

Number and types of boilers used 2 x THERM 90 KD.A
Total installed output 190 kW
Use of boilers central heating, hot water
DHW tanks 2 x THERM OKC 500 NTRR
Regulation of boiler room THERM VPT PSK ADS, THERM TKR
Construction realization 2020
Locality Blansko, Czech Republic
 

You might be interested...